TOP 5 BENEFITS OF USING INTERMITTENT BONDED RIBBON

Intermittent Bonded Ribbon Production Line Available For Sale

With a listed operating speed of 600 m/min, this machinery offers substantial capacity for optical-fiber production. Prospective buyers should confirm the achievable speed, machine setup, and required operating conditions directly with the manufacturer before proceeding.

Shanghai Weiye OFC supplies equipment designed specifically for producing rollable ribbons containing 12 or 16 fibers. Its product description presents the equipment’s capabilities, technical specifications, and included systems, providing U.S. buyers with a basis for comparing their equipment requirements.

Begin by examining the stated equipment configuration, then ask the supplier for pricing, installation requirements, and project-specific alternatives. Doing so can clarify which specifications and options are relevant to your facility and production objectives.

Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. provides its business address as 201 Minyi Road, Songjiang District, Shanghai. Use the product page for initial reference and verify current technical and commercial information directly with the company. Submitting a clear request for pricing and specifications can help you move forward with the assessment.




Key Takeaways

  • The stated operating speed is 600 m/min, although the manufacturer should confirm the applicable conditions.
  • This equipment supports production of 12-fiber and 16-fiber rollable ribbon formats.
  • The product listing describes machine capabilities, technical specifications, and supplied systems.
  • Request details about pricing, installation requirements, and project-specific customization.
  • The supplier provides a business address in Songjiang District, Shanghai.

Overview Of The Intermittent Bonded Ribbon Production Line

The manufacturer identifies this machinery as suitable for 12- and 16-fiber rollable IBR formats. The published specifications state a 600 m/min construction speed together with a fiber diameter of Ф245 μm ±10 μm. As these are manufacturer-listed values, confirm the actual production speed and relevant operating requirements directly with the supplier.

Intermittent Bonded Ribbon Production LineIntermittent Bonded Ribbon Production Line

Designed To Produce Twelve- And Sixteen-Fiber Rollable Ribbons

Two fiber-count options are supported by the configuration for manufacturing rollable ribbons. This provides a useful reference when buyers compare machinery against their required ribbon format, fiber dimensions, and material-handling arrangements.

How Intermittent Adhesive Bonding Allows Flexible Fiber Configurations

According to examples in the patent, fibers are arranged in adjacent subunits with adhesive connections applied periodically. The patent provides an example of adhesive-bond intervals ranging between 10 mm and 1,000 mm. Unlike continuous bonding, this arrangement does not join the fibers along their entire length.

These intermittent adhesive connections allow the assembly to change from a relatively flat configuration into rolled, curled, or folded forms. The specified spacing illustrates the patented design concept rather than confirmed production-machine settings.

  • Machine details: A choice of 12 or 16 fibers, a listed operating speed of 600 m/min, and a specified diameter of Ф245 μm ±10 μm.
  • Patent example: Illustrative spacing between adhesive bonds of 10 mm to 1,000 mm.
  • Design benefit: Flexible handling across several possible shapes.

Uses In Optical Fiber Cable Manufacturing

Adjustable fiber layouts may allow cable designers to combine convenient splice access with space-efficient packaging. The patent outlines a configuration that maintains fiber organization while allowing portions to move between adhesive connection points during cable assembly.

Compact Cable Designs And High Fiber Density

For mass fusion splicing, an optical fiber ribbon can be arranged flat before being folded or rolled into a more compact cable. Potential advantages described in the patent include smaller cable constructions and an increased ratio of fiber area to overall cable cross-sectional area. Actual performance and dimensions will vary according to the overall cable design and the application for which it is intended.

Organizing Fiber Ribbons To Support Efficient Fusion Splicing

The ribbon format enables organized handling at the splice location while allowing the subunits to move during cable assembly. For production material planning, the listed specifications include payoff reels accommodating 25.2 km and 50.4 km of fiber. Buyers can evaluate these capacities against their production requirements and existing handling arrangements.

Design detail Possible application Buyer consideration
Flat fiber configuration Fusion splicing of multiple fibers Verify the needs of your splicing process
Folded or rolled format Compact cable packaging Review the overall cable construction
Payoff reels with capacities of 25.2 km and 50.4 km Planning material-handling operations Match the reel capacity to production operations

Specifications And Performance Of The Production Line

Before asking for pricing, assess whether the stated machine performance matches the demands of your production process. Reel compatibility and facility utility requirements are also important considerations for installation planning.

Production Speed, Fiber Diameter, And Attenuation

The stated construction speed is 600 m/min. The specified fiber diameter is Ф245 μm ±10 μm, while additional attenuation is stated as ≤0.01 dB/km at 1550 nm. Confirm the measurement conditions and expected performance directly with the manufacturer.

Compatibility With Payoff And Take-Up Reels

Two payoff reel sizes are offered, with each full reel limited to 10 kg. For take-up, the equipment accepts either a T-type reel or a fiber-optic reel. Verify that your selected reel configuration is compatible with the facility’s material-handling process.

Facility Utilities And Operating Environment

The machine requires a three-phase, five-wire electrical supply rated at 380 V ±10%. The equipment should operate in an enclosed, clean, dry, draft-free area maintained at 15 to 25°C and a maximum relative humidity of 85%. Nitrogen must be supplied at 7 bar with 99.99% purity, together with compressed air at 6 bar. Verify the required utility connections before installation begins.

Technical specification Listed requirement Installation planning note
Payoff reels Ф236 × Ф25.4 × 108 mm; Ф267 × Ф25.4 × 180 mm; maximum full-reel weight ≤10 kg Check reel compatibility and maximum weight
Reel used for take-up T-type reel: Φ410 × Φ50.8 × 391 mm, alternatively a fiber-optic reel Confirm compatibility with your selected format
Electrical and environmental requirements 380 V ±10%; 15 to 25°C; relative humidity ≤85% Provide a clean, dry area without drafts
Gas utility supply Nitrogen: 7 bar, 99.99% purity; air: 6 bar Verify gas supply capacity before installation

Fiber Payoff And Gathering Equipment

The payoff and gathering assemblies direct optical fibers into the ribbon-forming area. The associated controls help maintain a steady supply of fiber while reducing handling risks.

Sixteen-Spool Payoff With Tension Control

The payoff assembly holds 16 spools and provides traversing along with separately adjustable tension settings. The permitted weight for an individual spool is up to 10 kg. Detailed specifications indicate a tension range of 0.4 to 2 N, accuracy of ±0.02 N, and a 550 W motor. Because a separate overview states 40 to 150 g with ±2 g accuracy, ask the manufacturer to clarify the correct values for your intended setup.

Fiber Guiding, Break Detection, And Electrostatic Control

U-groove guides, multi-groove gathering rollers, and anti-jump components channel fibers into the forming section. Operators receive alerts about fiber problems through break detection and alarm functions. Safe handling is supported by protective guards and a pneumatic clamping mechanism. At the fiber exit, a rod-style electrostatic dust collector is installed, while anti-static equipment helps manage dust along the gathering route.

Equipment component Listed detail Intended function
Fiber payoff assembly Capacity for 16 spools, each weighing up to 10 kg Supplies fibers using traversing
Motor and tension system Tension of 0.4 to 2 N, accuracy ±0.02 N; motor rated 550 W Maintains controlled fiber payoff
Guidance and safety Grooved rollers, alarms, guards, and pneumatic clamping Directs fibers and supports safe handling
Electrostatic management Rod-style electrostatic collector with anti-static devices Supports dust control along the fiber path

Intermittent Adhesive Dispensing And Precision Molding

Operators can adjust adhesive positioning and mold alignment through the forming platform. Available adjustments help configure the process for each required ribbon format.

Ribbon Formation Using An Adjustable IBR Mold Platform

Ribbon formation uses three mold assemblies, each capable of holding up to five Nordson EFD jet valves. The mold adjustment range extends from 0 to 15 mm, while the mold base can be maintained between 20°C and 60°C. Precision valve groups mounted on sliding tables allow fine positioning and accurate application of adhesive dots.

Adjustable Nozzle Configurations For Twelve- And Sixteen-Fiber Ribbon Production

The 12-fiber configuration employs a 5+5+1 valve arrangement. Production of the 16-fiber format uses a 5+5+5 configuration. Operators can adjust adhesive-dot spacing and the number of dots through the interface to match the selected optical fiber ribbon design. The process calls for a specialized adhesive suitable for both coating and curing.

Process setting 12-Fiber Format 16-Fiber Format
Dispensing valve layout Valve arrangement of 5+5+1 5+5+5 valve configuration
Mold adjustment 0 to 15 mm adjustment 0 to 15 mm adjustment
Mold-base temperature Temperature range of 20°C to 60°C Temperature range of 20°C to 60°C

UV-LED Curing For Bonded Fiber Ribbons

The curing assembly applies UV exposure in stages to harden adhesive throughout the fiber structure. Prospective buyers can assess the oven configuration and listed operating specifications to determine whether the equipment suits their production process.

Initial Pre-Curing And Main Curing Operations

Three dedicated LED-UV ovens rated at 800 W each perform the pre-curing operation. Each oven processes fibers supplied by a separate mold group before the material reaches the main 6 kW post-curing oven. Adjustable shutters reduce potential UV leakage and nitrogen loss. The supplier states a principal wavelength of 395 nm ±3 nm, minimum curing degree of 85%, and post-curing power of no less than 2.5 kW.

Nitrogen Management And Curing Performance

Operators can manually regulate nitrogen pressure and flow. The system additionally switches nitrogen on when starting and off when shutting down. The manufacturer states that lamp-array power use remains at or below 80% of total power during steady, continuous operation at production speed. The figures are useful for initial equipment assessment, but buyers should confirm the conditions under which they were measured. Ask whether different adhesives or materials require adjustments to the settings.

Visual Inspection, Capstan Traction, And Take-Up

Visual inspection and consistent winding help preserve fiber quality as material passes through the production line. Buyers can use the listed specifications to assess whether the machine meets the demands of their cable manufacturing process.

Real-Time Inspection Of Fiber Colors And Adhesive Dot Placement

A microscope and camera provide enlarged images in real time. Operators can inspect optical-fiber color order and verify the presence of resin dots at individual dispensing locations. This inspection helps identify ribbon problems before the material enters the winding stage.

Servo-Driven Traction And Precision Take-Up

A 1 kW AC servo motor powers the capstan’s Φ190 mm traction wheel. Metering accuracy is specified as better than 1‰. Operators can set tension between 50 and 500 g while maintaining an accuracy of ±5 g. These operating parameters help maintain careful fiber-ribbon handling as the material advances through the line.

Take-up operation is rated at 600 m/min with a spool weight limit of 30 kg. Servo-controlled winding and traversing systems help maintain consistent material placement. Cable pitch can be adjusted continuously between 1 and 6 mm. A photoelectric sensor monitors position and assists with reversing direction. Check the intended cable requirements and actual operating conditions with the manufacturer.

Production Monitoring And Electrical Control Systems

Clear control functions help production staff manage settings, monitor system conditions, and prepare smooth stopping procedures. The supplier identifies Siemens control equipment and Schneider Electric switchgear as components of the production line.

PLC And Touchscreen Operation

The ribbon production line uses Siemens S7-1200 and S7-1500 PLCs with a 10.4-inch Siemens touchscreen interface. Low-voltage switchgear is supplied by Schneider Electric. The system supports both interlocked operation across the full production line and separate operation of individual units.

Process Settings, Warning Alarms, And Preset-Length Shutdowns

Through the touchscreen, operators can manage process settings, activate curing ovens, configure wire feeding, and view alarms. Additional displays provide lamp runtime, real-time current readings, curing-oven temperature, and total machine operating hours. A meter-counter correction function helps synchronize displayed length measurements with actual material movement.

A preset length can be entered to initiate slowing or stopping of the machine. This provides a practical way to control the end of a cable production run. Verify the available controls and configuration requirements with the supplier before purchasing.

Control-system feature Listed detail Practical function
PLC and display Siemens S7-1200 and S7-1500 PLCs with a 10.4-inch touchscreen Configure settings and examine production data
Electrical control components Low-voltage switchgear from Schneider Electric Provides support for system control
Monitoring and stopping Operating data for lamps, ovens, runtime, and meters; preset-length function Track operating conditions and initiate machine stopping or slowing

Ribbon Quality, Material Selection, And Process Compatibility

Adhesive selection affects both the consistency of coating application and the final product. The manufacturer calls for a specialized adhesive intended for the machine’s coating and curing process instead of an ordinary multipurpose product.

Dedicated Adhesive For Bonding And Curing

The pressure-fed adhesive system provides independent valve switches so each supply path can be opened or closed as required. Precision pressure-regulating valves help maintain controlled adhesive delivery at each dispensing location. Air pressure can be regulated but must remain at or above the listed minimum of 0.5 MPa.

Black adhesive supply tubing helps protect the material from reactions caused by UV exposure during operation and curing. Preventing unintended exposure matters because adhesive behavior could be affected before the material reaches the fiber surface.

Confirm suitable adhesives, process parameters, and surface-finish requirements with the manufacturer before choosing materials for a secondary coating operation. Ask how the recommended adhesive performs under your intended application conditions and expected production length. Detailed manufacturing guidance can support consistent quality throughout setup and the completed run.

Equipment Installation Needs And Supplied Documentation

Ensure the workspace and utility supplies are ready before scheduling the machine’s installation. The manufacturer’s stated requirements help buyers prepare their facilities and maintain stable operation of the optical fiber equipment.

Facility Conditions And Buyer-Supplied Connections

The machine should be positioned inside a draft-free, enclosed workspace that is clean and dry. Maintain a room temperature of 15 to 25°C and relative humidity no higher than 85%. The installation also requires nitrogen supplied at 7 bar with 99.99% purity and an air supply rated at 6 bar.

Connection cables and cable trays are excluded from the supplied equipment. The buyer must arrange the principal power feed-in cable. Verify the available utilities and planned cable routes ahead of setup, especially if a secondary coating section is nearby.

Operating Manuals, Drawings, And Maintenance Information

Documents covering installation, equipment use, and maintenance are provided by the manufacturer. Inspect the supplied documentation before commissioning so personnel can organize tasks and obtain required materials.

  • Operating and instruction manuals together with the overall equipment layout drawing
  • Wiring and electrical schematic diagrams, plus installation and maintenance drawings
  • Manuals for purchased parts and a list of wear parts for maintenance planning

The supplied records support preparation for commissioning and routine servicing of the cable production machinery.

Selecting A Ribbon Production Line That Matches Your Manufacturing Requirements

First determine which finished ribbon products your business plans to offer. This production line is designed for 12F and 16F options, with a listed construction rate of 600 m/min. Assess the stated capabilities against your planned range of products, throughput requirements, and projected cable orders.

Verify take-up reel compatibility before placing an equipment order. A standard IBR reel measures Φ410 × Φ50.8 × 390 × Φ310 mm, accommodates a maximum weight of 30 kg, and allows cable pitch settings between 1 and 6 mm. Check that these specifications suit your production facility and material-handling operations.

Payoff reel compatibility also deserves attention. The listed choices include internationally standardized spools with capacities of 25.2 km, 50.4 km, and 63 km. Request precise reel measurements before selecting materials or determining production run lengths.

In addition to speed, consider power and gas utilities, suitable adhesives, and the available monitoring functions. For cable manufacturing, determine whether the configuration suits fiber cable, loose tube, or another planned application. Discuss machine configuration and commissioning arrangements with Shanghai Weiye before committing to the purchase. Checking equipment suitability in advance can reduce the likelihood of costly changes after purchase.

Production planning consideration Manufacturer-listed specification Required buyer verification
Ribbon configurations and operating speed 12F, 16F; specified speed of 600 m/min Compare with target production and product mix
Take-up configuration 30 kg maximum capacity; adjustable pitch from 1 to 6 mm Verify that the reel and site arrangements are suitable
Fiber payoff reel options 25.2 km, 50.4 km, and 63 km spool capacities Confirm the precise reel measurements

Request A Quote For The Intermittent Bonded Ribbon Production Line

For U.S. manufacturers, the equipment provides 12F and 16F configurations, a listed construction speed of 600 m/min, and dedicated machinery for forming optical fiber ribbons. Use these specifications to determine whether the machine is appropriate for your intended cable application.

When requesting a quotation, provide the required ribbon format, expected output volume, preferred reels, and available site utilities. Include information about the fibers and material-handling process to allow Shanghai Weiye to review the intended setup.

Confirm the suitability of the adhesive, the LED wavelength specification of 395 nm ±3 nm, and expected curing results before purchasing. Ask the supplier how these parameters relate to the chosen materials and required surface quality.

Use the manufacturer’s product listing to examine the equipment information. Contact Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. to confirm machine configuration, delivery arrangements, and commissioning requirements. The company’s listed address is 201 Minyi Road, Songjiang District, Shanghai. Telephone 021-60701630 to discuss your manufacturing requirements. Providing complete information in your quote request makes the following stages easier to clarify.